Logo of Hefei ZhongChen Light Industrial Machinery Co.,Ltd

Key Facts

  • Beer Filler&Crowner
  • Beer Tunnel Pasteurizer
  • Electronic Valve Filler & Seamer

Categories

  • Machinery and installations for beer production
  • Machinery and installations for the production of wine, sparkling wine and spirits
  • Labellling
  • Process automation, control and control systems

Key Facts

  • Beer Filler&Crowner
  • Beer Tunnel Pasteurizer
  • Electronic Valve Filler & Seamer

Categories

  • Machinery and installations for beer production
  • Machinery and installations for the production of wine, sparkling wine and spirits
  • Labellling
  • Process automation, control and control systems
Show More

PRODUCT DESCRIPTION

Turn-key project for Beer Packaging Line:
- Major applicable container: glass, can, keg, aluminum bottle, etc;
- Capacity:
Up to 60,000BPH glass bottling line;
Up to 90,000CPH canning line;
PET draft beer / Aluminum bottle beer / S.S bottle beer bottling line.
- Scope of supply:
Production line in Glass bottle:
Crate depalletizer / bulk depalletizer, uncaser, crate washer, bottle washer, EBI, filler & crowner, crown feeder, FBI, tunnel pasteurizer, air blow dryer, labeling, date coder, crate packer / carton packer, check weigh, palletizer, bottle / case conveyor, electrical control system, etc.

Production line in Can:
Automatic bulk can depalletizer, empty can detector, can rinser, filler & seamer, tunnel pasteurizer, level detector, blow dryer, date coder, full automatic carton packer / shrink film packer, auto palletizer, empty / full can and case conveyor, electrical control system, etc.

Process and utility system:
Water treatment system, CIP cleaning system, air compressor, boiler, chiller, CO2 generation & storage system, piping system, etc.

Beer Filler&Crowner:
High accuracy pneumatic electro-filling valve or mechanical filling valve with double pre-evacuation, no bottle no pre-evacuation & no fill
With sanitary bedplate, burst bottle flushing, auto elevating for changeover
With imported high-pressure bubbler and synchronized with filler speed, bubbling with 85
hot sterilized water
Circulation CIP with dummy cups

Beer Tunnel Pasteurizer
Full S.S structure, double deck is applied in middle & high capacity line, S.S or engineering plastic chain mesh, with over-current and mechanical overload protection
Water/heat recovery technology, centralized heat exchanging design adopted
Less temperature gradient
Auto PU control system

Electronic Valve Filler & Seamer
Electronic volumetric filling with high fill precision
Online adjustment of filling volume
Hefei made seamer, 12heads speed can reach 110,000cph


Show More
graphical blue background

3 Beer Packaging Line Solution

Product Expert